Custom LGSF constructions — residential buildings, family houses, infills | Skymax Living
LGSF systems manufacturer — Czech Republic

Anything that can be built,
build it from LGSF steel.

We deliver certified steel LGSF constructions precisely tailored to your project — from family houses to residential complexes. Faster, cheaper, and with less waste than traditional methods.

Skymax Living is a manufacturer and supplier of LGSF systems. We do not build — we deliver the most precise construction your project can get. Sales via PRO-DOMA or direct.

42%
total costs compared to masonry
3–4×
faster wall construction
<1%
construction waste compared to 15–20% in masonry
±1mm
precision of CNC manufacturing for every profile
✓ CE Mark EU
✓ ETA certification
✓ REI 60–120 fire resistance
✓ Saint-Gobain partner
✓ Eurocodes EN 1090
01 — For Whom

Developers, construction companies
and private builders.

LGSF constructions work for projects of all sizes — from a single family house to an entire residential complex.

Primary segment
Developers & construction companies
Are you building larger projects and need speed, predictable costs, and scalability? LGSF is for you. One system for the entire project — from walls to roof.
Residential Buildings Terraced houses Commercial buildings Insertions into halls Public Facilities
Family buildings
Private builders & architects
Do you want a family house that is faster and more ecological than a timber frame or masonry? LGSF delivers your architectural vision without compromise.
Family Houses Atypical projects Extensions Tiny Homes
02 — Project Types

You can build practically anything with LGSF.

One system, unlimited possibilities. See what we can deliver.

03 — Why LGSF

Why developers
choose the LGSF system.

Every project is different. But the results are consistent — faster schedule, lower costs, fewer issues on site.

Schedule under control
Panel production runs in parallel with the frame construction. Panels arrive on site exactly on time — no waiting for materials.
Predictable costs
CNC production with ±1 mm precision eliminates re-measuring, additional masonry, and extra work. Cost estimates hold from the initial offer through to handover.
Certification for the entire project
CE Mark, ETA, REI 60–120, Eurocodes. Everything the building authority requires is prepared. No improvisation during final inspection.
Scalability
Single project or entire portfolio. Our production capacity in Ostrava covers even large-scale developer projects with repetitive typologies.
42%
total costs compared to masonry (material + labor + time)
3–4
weeks
wall construction instead of 5–6 months with masonry
<1%
construction waste — masonry produces 15–20 %
±1mm
CNC production accuracy — no additional masonry or extra work
Data — real comparison
LGSF vs. alternatives.
The numbers speak clearly.
We compare real data from construction projects in the Czech Republic. Speed, costs, waste — three key parameters that determine the success of every project.
🏆 LGSF Skymax 20 % of masonry time
Timber construction 55 % of masonry time
Traditional masonry 100 % — reference
LGSF Skymax
Timber construction
Traditional masonry
Data from real projects in the Czech Republic 2024. Lower value = better result. Exact comparison depends on the specific project.
Wall construction speed
faster
3–4 weeks instead of 5–6 months with masonry
Source: Skymax Living’s own data from completed projects
Cost savings
58%
savings
Total costs 42% compared to 100% for masonry
Material + labor + time + waste
🏆
The best choice for developers
Lower costs, shorter schedule, certified quality
🔧 Free interactive tool

How much will your project cost?
Calculate it yourself.

The indicative construction price calculator compares LGSF with timber frame and masonry construction. 5 steps, immediate result — no registration, no obligations.

Comparison of LGSF vs. timber frame vs. masonry
Considers layout, standard, region
Indicative price within 2 minutes
Free, no registration
Launch price calculator →
skymaxliving.com/kalkulator
🏠 Construction Price Calculator 2025
How much will your house cost?
Area — 150 m²
Layout — 1 floor + attic
3
Energy standard
4
Region
5
Result
Indicative LGSF price
4,200,000 – 5,100,000 CZK
compared to masonry: 6,800,000 – 8,200,000 CZK
04 — References

Real project.Real results.

Pivovar Radegast — fit-out during full operation. Exactly the kind of project where LGSF shows what it can do.

LGSF steel skeleton Radegast brewery
LGSF construction assembly Radegast
Fire-resistant cladding Radegast
Completed exterior of Radegast mezzanine
🏭 Pivovar Radegast — Plzeňský Prazdroj
Two-storey fit-out inside a production hall — during full brewery operation
Complete LGSF fit-out in Nošovice — new production, administrative and social facilities without interrupting operations. Dry construction methods, minimal noise and dust.
System
LGSF C89 profiles
Floors
2-floor fit-out
Fire resistance
REI 60 minutes
Project
During full operation
Read full case study →
skymaxliving.com/srovnani
Comparison of construction systems
Parameter
LGSF
Masonry
Construction time
3–4 weeks
5–6 months
Total costs
42 %
100 %
Construction waste
< 1 %
15–20 %
Manufacturing accuracy
± 1 mm
± 10–30 mm
Relative construction time
LGSF Skymax20 %
Traditional masonry100 %
📊 Free interactive comparator

LGSF vs. timber frame
vs. masonry — data decide.

Our interactive comparator shows real construction data — speed, costs, waste, precision. No marketing, just numbers. Make decisions based on facts.

Visual graphs — time, costs, waste
Data from real projects in the Czech Republic
Comparison of 3 systems at once
Free, no registration
Open comparator →
05 — Process

From inquiry to delivery to site.

Skymax Living is the manufacturer — we deliver a tailor-made structure. The construction is managed by your company or your partner.

01
Inquiry & project
Send us your project or inquiry. We need basic dimensions and building type — we handle the rest.
02
Offer & specification
We prepare a technical specification and price offer. You receive a precise bill of materials and production schedule.
03
CNC production
Manufacturing in our CNC line in Ostrava — accuracy ±1 mm. Panels arrive on site ready for immediate assembly.
04
Delivery to Site
We deliver the structure exactly on time. Sales via PRO-DOMA (50+ branches in CZ and SK) or direct delivery.
Order via PRO-DOMA — 50+ branches in CZ and SK
The largest building materials distribution network — Skymax LGSF systems in stock or on order.
06 — Inquiry

Inquire about a tailor-made structure.

Tell us about your project — we will respond within 2 working days with an offer and technical documentation.

📐
Precise offer within 48 hours
Bill of materials, technical specification, indicative price.
🏭
CNC production in Ostrava
Own production capacity — accuracy ±1 mm, quality control.
🚚
Delivery via PRO-DOMA
50+ branches in CZ and SK. Or direct delivery to site.
📄
Complete certification
CE Mark, ETA, REI 60–120 — all for building permits.
Prefer to call?
+420 724 913 954 [email protected]
We respond within 2 working days

Inquiry — tailor-made structure

Fill in basic project information. The more you tell us, the more accurate the offer.

Non-binding inquiry
Response within 48h
No hidden fees
Custom LGSF constructions Response within 48 hours