As an architect, you are looking for a material that offers you maximum design freedom while ensuring the feasibility of your design. LGSF offers both — plus the precision that traditional materials cannot provide.

Why architects are switching to LGSF

1. Design flexibility

The high strength-to-weight ratio of steel profiles enables:

2. Accuracy: Design = Reality

This is probably the greatest advantage of LGSF for architects. CNC roll-forming machines produce profiles with ±0.5 mm accuracy. This means:

Accuracy comparison: - LGSF: ±0.5 mm (CNC) - Wood: ±2–5 mm - Masonry: ±10–20 mm - Concrete: ±5–10 mm

3. BIM integration

LGSF is naturally compatible with BIM workflows:

4. Adaptive reuse

Unlike concrete, where remodeling means costly demolition, LGSF allows:

Technical parameters for design

Parameter Value
Profile thickness 0.8–2.5 mm
Material Galvanized steel S350–S550
Profile height 89–305 mm
Max. span (ceiling beam) 8–12 m
Max. building height 15 floors
Fire Resistance REI 30–120
Thermal resistance of wall R > 6 m²K/W
Sound insulation Rw > 55 dB
Manufacturing accuracy ±0.5 mm

Typical LGSF wall assembly

External wall (from outside to inside): 1. Façade cladding (any type — plaster, cladding, wood, metal) 2. Air gap + diffusion membrane 3. Thermal insulation (mineral wool 100–200 mm) 4. Steel C/U profile (load-bearing structure) 5. Vapor barrier 6. Installation lining wall (optional) 7. Plasterboard (1–2 layers)

Total thickness: 150–250 mm (vs 400–500 mm for masonry)

How to start designing with LGSF

Step 1: Contact Skymax Living

Our technical team will provide you with: - Consultation for your project - Technical documentation and details - BIM libraries for Revit/ArchiCAD - Reference projects and case studies

Step 2: Design in BIM

Design your building in BIM using LGSF profiles. Our team will review structural calculations and optimize the design for manufacturing.

Step 3: Production and assembly

Manufacturing data for CNC machines is generated from the BIM model. Panels are produced in the factory and delivered to the site. Assembly of the structural frame of a family house takes 3–5 days.

Architects section on the Skymax Living website

In Preparationprotected section for architects with access to: - Complete technical details and sections - BIM libraries and models - Certificates and approvals - Reference projects with photos - Calculation tools

Register for access and get everything you need for designing with LGSF.